Skip to product information
Norsat LNB Redundant Switch System

Norsat RSLNBC11FRM LNB Redundant Switch System, 1:1, C-Band, F-Type, 10 MHz Reference + Boom Mount

Price on request

Quote-based pricing for government, teleport and enterprise buyers.

Need it installed, integrated or supported? Ask about Digisat engineering services.

Product details

The Norsat RSLNBC11FRM is an LNB Redundant Switch System from Norsat's LNB Redundant Switch range. It detects a failed LNB and switches automatically to a standby, maximizing receive availability.

This configuration: Redundancy: 1:1; Band: C-Band; Connector: F-type (75 Ω); Options: 10 MHz Reference + Boom Mount. Key specs: Switchover time: 550 ms max; Insertion loss: Waveguide to LNB: 0.5 dB max.; LNB to Cable: 2.8 dB max; Redundancy: 1:1.

Need a different configuration? The LNB Redundant Switch Series comes in 144 part numbers. Compare them on the series page.

Other configurations

Compare all 144 Norsat LNB Redundant Switch System models

Specifications

Part number RSLNBC11FRM
Series Norsat LNB Redundant Switch
Frequency range 950–2150 MHz
Redundancy 1:1
Connector F-type (75 Ω)
Options 10 MHz Reference + Boom Mount
Switchover time 550 ms max.
Insertion loss Waveguide to LNB: 0.5 dB max.; LNB to Cable: 2.8 dB max.
Power 100–240 VAC (50–60 Hz)
Input connector WR-229
RF output connector F-Connector
IP rating IP 66
Relative humidity Operational: 8% - 100%; Storage: 10% - 100%
Temperature, operational -40 to +60 °C
Temperature, storage -50 to +80 °C
Controller box height 66.80 mm
Controller box length 411.73 mm
Controller box weight 3.4 kg
Controller box width 163.83 mm
RF switch height 213.36 mm
RF switch length 97.28 mm
RF switch weight 2.74kg
RF switch width 100.33 mm

Compliance and export

Country of origin Canada
ECCN EAR99
HS code 8517690000
Warranty 3 years

Designing a redundant earth station?

Digisat engineers design, install and commission 1:1 and 1:2 redundant transmit and receive chains for teleports, gateways and government sites, including switch integration, M&C and failover testing. Talk to an engineer.